Western Corridor Submission

This page has the submission prepared by Porirua City Council on the Western Corridor Transportation Plan, along with the appendices which contain various reports.

We support a comprehensive approach that will provide a win-win solution and set the region on a positive footing for the next 50 to 100 years. The building of Transmission Gully is central to our proposition. The appendices support our contention that an upgrade of the Coastal Route will be the wrong way to go.

Submission

Download and print Porirua City Council's Submission on the Proposed Western Corridor Plan (153KB pdf).

Appendices

Download and print the Appendices to the Report (all in pdf format). Some files contain maps and diagrams, and most are less than 1 MB.

Appendix 1: Map showing traffic model figures for 2001 traffic volumes, 2016 volumes with northern TGM, and 2021 volumes with the whole of TGM.

Appendix 2: Strategic Roading Improvements (TGM North) – Programme and Cash flow

Appendix 3: Report of Public Transport and Travel Demand Management (November 2005)

Appendix 4: Statement by John Foster – Traffic Engineer (November 2005)

Appendix 5: West Corridor Transportation Emergency Management Assessment – Marshall Hyland (Porirua City Council November 2005)

Appendix 6: Western Corridor Transportation Study: Review of Geological Hazards affecting the proposed Coastal Highway Upgrade and Transmission Gully Motorway route. – Hancox, Dellow, Perrin and Mc Saveny (IGNS Nov 2005)

Appendix 7: Landscape Assessment and Review of the Western Corridor Transportation Study – Linda Kerkmeester and Julia Williams, Landscape Architects.

Appendix 8: Coastal process review of the Western Corridor Coastal Route Upgrade (Draft) – Richard Reinen-Hamill, Tonkin and Taylor (October 2005)

Appendix 9: Assessment of some of the potential effects on the nearshore marine and beach environment at Paremata, Pauatahanui Inlet, Plimmerton and Pukerua Bay from construction of the Western Corridor Coastal Route option. - Martin Cawthorn and Associates. (October 2005)

Appendix 10: Porirua City Ecosites affected by Coastal Upgrade Route and Transmission Gully. Dr Paul Blaschke (November 2005).

Appendix 11: A Review of the Social Impacts Assessment of the Western Corridor Transport Study – Ben Peacey and Peter Matich (Porirua City Council November 2005)

Appendix 12: Western Corridor Transport Study Noise Effects Report – Hegley Acoustic Consultants (November 2005)

Appendix 13: Porirua City Council Submission on the Proposed Western Corridor Plan - Review of Economic Aspects – McDermott Miller Ltd (November 2005)

Appendix 14: Review of cultural aspects of the Coastal Route & Transmission Gully Motorway – Western Corridor Transportation Study – Boffa Miskell Ltd (November 2005)

Appendix 15: Western Corridor Transportation Study – Review of Consentability and Planning Issues for Porirua City Council – Hill Young-Cooper Ltd (November 2005)

Updates

Appendix 6 - Peer Review by Dr M R Johnson, President, Geological Society of New Zealand

Appendix 6 - Peer Review by Ian Brown Associates Ltd, Geological Engineering Consultants

Appendix 11 - Update to A Review of the Social Impacts Assessment of the Western Corridor Transport Study – Ben Peacey and Peter Matich (Porirua City Council November 2005)

Appendix 12 - Correction to Noise Effects Report

Appendix 13 - Update to Porirua City Council Submission on the Proposed Western Corridor Plan - Review of Economic Aspects – McDermott Miller Ltd (November 2005)

Independent Supplementary Report on Cost Estimates on Cost Estimates by John Rutledge.